Monday, December 27, 2010

After a break the Construction Continues

Well it has been nearly 2 weeks since something noticeable was accomplished. Actually in that time period a lot of materials have been brought on sight including the steel support beams, floor joists, roof trusses and more. Unfortunately while trying to install the steel beams last week the framers noticed some problems with the beam pockets and anchor bolts the concrete folks put in. One set of beam pockets wasn't made deep enough for the steel beam - a 14" tall beam doesn't work well in a 12" tall pocket! As a result I had to have the concrete folks come back and cut the pocket deeper and order some steel shims to use for some other corrections. The fun life of the general contractor!

So today they were finally able to place the 2 steel beams and progress begins to crank up again. You will note the 2 beams - one spans the entire 60' length of the building and has 2 columns of support. The other "just" spans 25' and is beefy enough to need no columns. Amy was home and was able to get some action shots of the work.















Sunday, December 12, 2010

Basement floor is in

This past week we scrambled to beat the incoming winter weather. The plumber put in all the below grade plumbing. Including the trench drains for the cellar. As the plumbers were finishing up their work the guys that were putting in the basement floor were busy at work getting the dirt prepped to pour the concrete. Fortunately we had 2 really nice days last Thursday and Friday with temps in the 50's. They got the rock base down late on Thursday and we rented a ground heater to heat the soil and covered that with insulating blankets. With the ground already frozen to about 6" they were worried about pouring a slab on already frozen ground, so that is where the heater came in. Friday morning the floor was poured so when I got back from work late Friday we had a basement floor! They came on Saturday morning to cut the joints and cover it up with insulating blankets to keep it warm as we had highs in the low teens on Sat and Sunday and lows below zero - ahh a wonderful Nebraska winter day!
This week will be a bit slow as my framer can only get in next Monday, but I will be busy behind the scenes making sure the steel beams, roof trusses, lumber and windows get scheduled.








Sunday, December 5, 2010

The basement Walls Are Up!



The walls got poured on Wednesday and the crew started removing the forms on Thursday and into Friday. Also on Friday they added waterproofing and drain tile. It is starting to look like a building. This coming week the underground rough in plumbing goes in and maybe the basement floor will get poured.

Friday, December 3, 2010

The basement walls go up

This week the crew set up the forms for the basement and poured the walls on Wednesday. Here are some of the pre-pour set up pictures. With the days so short it is hard to get pics during the week before or after work, so we will take plenty of pictures of the finished basement this weekend.