Saturday, November 27, 2010

Footings Poured



The footings are in and are awaiting the walls! On Tuesday the crews came in and dug for the footings and Wednesday, before some light drizzle came, they poured the concrete for them. Next up the forms for the basement wall will get set and the basement walls will get poured. It was a good Thanksgiving knowing progress is being made.

Monday, November 22, 2010

Construction Begins


Last Thursday we finally kicked off construction of our new winery and tasting room facility. The hole for the basement was dug. It changed the landscaped quite a bit on the site. Then Sunday Richard's brother Bob stopped by to help survey in the corners of the building. This is in preparation of the pouring of the footings on Tuesday.

It is great to finally be moving forward and get our building going.

Tuesday, October 19, 2010

My Harvest is Over

Well my time at Sonoma Cutrer has come to an end. After 125 tons of grapes, countless punch downs, 20 some tanks of wine processed, a lot of long days, but most of all a lot of fun and a great learning experience. What an adventure.

Amy and I will take a little time to see a few things and hit the road back to Nebraska. It is quite tough to leave as I have had a great time, the area is gorgeous, and the weather is even better. I am not looking forward to winter being right around the corner.

When we return we have a winery facility to get built. That will be the next adventure and more stories to tell - the blog will continue!

Monday, October 18, 2010

Pressing & Barreling Down







The last few days have been a mix of pressing tanks and barreling down the juice from those presses the following day (This give them a night to settle). I have included some pics of the post pressing emptying of the press. The pressed grape skins remain in the press basket. The basket is removed from the press and the inside of the basket is hoisted high with a fork lift, the basket is opened, and the remnants are dumped over 4 macro bins.

Thursday, October 14, 2010

More of the Same

Nothing exciting to report from today. We barreled down 28 more barrels and we emptied out 2 more tanks - I only had to shovel one of them - the early one when it was 50 degrees and not the one when the temp reached about 95. Lucky me.

The big news of the day is my sweetie Amy is flying in to join me for a week before we head back home in a week. It will be good to have some company!

Wednesday, October 13, 2010

Barreling Down




Today was a big day as we barreled down 2 tanks into 28 barrels - I have attached a couple of pictures which show our barrel washer. You can put 2 barrels on it at a time and it takes about 2 minutes to clean the barrels. Then they are ready to fill.
Along with the barrel downs we also drained and pressed 2 tanks - I was "fortunate" enough to shovel out both tanks - and on my birthday - quite the present! The first tank was ok as when I did that one it was 7am and about 48 degrees. Contrast that with the second one at 1:15pm and about 90 degrees. PHEW! Nothing like shoveling 5 tons of grape pumice at that temp.

Tuesday, October 12, 2010

First day without fruit
















Our first day without fruit and there was still plenty to do. We had our twice daily punch downs - those seem to be never ending! Then today we did a barrel down of a tank that had been pressed yesterday into 14 barrels plus we drained a tank that had completed fermentation to the press basket and pressed off the skins. This gets any remaining juice from the skins and allows the juice to settle.
As mentioned in a previous post one of the fun activities after draining a tank is to shovel out the skins from the tank to get ready for pressing. Here you can see some "action" shots of me shoveling out the tank. Plus you see inside the man way door before the clean out and after I shoveled it out. Finally you can see the press basket after it was filled and just prior to putting it in the press
Look like fun?