Vestibule Floor






After spending 3 days in Kearney at the Nebraska Wine and Grape Growers Forum (including an unbelieveable banquet speech by noted wine writer Doug Frost) we came back to find our vestibule floor had been cemented in. Above we have some before and after shots of the pour. The cardboard  you see are void forms. The concrete was poured on top of the cardboard. It leaves a void so the freezing and thawing won't cause a problem.

Other pictures show the completed (by Rich and Erich) shingling on the kickout and the new garage door. The final shot is an inside shot of the can lights that have been installed.

Currently the HVAC company is busy installing the duct work and that will continue into this week. We have run into a scheduling snafu as the main beam for the vestibule will take a minimum of 4 weeks to get made. Hopefully that doesnt slow us down too much.