Monday, April 11, 2011





Work continues on the vestibule. The cedar tongue and groove decking is getting added. Unfortunately due to a mis-calculation by the supplier we ran a bit short and have to wait for another shipment. It appears they only calculated for one half of the roof. But it is coming along and looking good.

This weekend, along with more siding, we added some non-shrink grout underneath the beam columns on the vestibule and in the basement (second picture from bottom). As well as filling in the basement beam pockets with the same. Finally I came back and topped off one  of the two vestibule columns with concrete. 18 bags of concrete mix later the bottom picture shows the results but doesn't show my aching back from the hand mixing!. I still have the second column on the vestibule and the two basement columns to fill.