With the three day Memorial Day Weekend we were able to get plenty of work done on the winery. We were able to finish up the fire blocking, fire caulking,  re working the HVAC soffit in the basement (I didn't know 2x2's were a no no)  and a few other inspection related items. Plus we finally got the building secure by adding a temporary front door.




We also worked on the shingling the south side of the vestibule roof (until the high winds forced us away from that endeavor). But at least it got all papered in and water tight!




Finally we readied our selves for the arrival of the fireplace. A platform was built for the unit to sit on. It will be an LP gas unit.